This has been a slow week for darkroom construction as we’ve had to wait for city inspectors to sign off on the construction and the electrical wiring, and because of the pandemic these are taking longer than usual.
Inspections
The inspector from the State Department of Labor and Industry (wonderful!) came by for the electrical work and was quickly satisfied. “A darkroom, this should be simple.” 30 seconds later, “OK, cover it up!” But then we had to wait for the building inspector to approve the framing and support as we have a storage area above. He came by a few days later and took a look at the plans. “OK, so you’re building a darkroom, this shouldn’t be a headache.” A couple of minutes later and he’d signed off too. Now it’s a question of getting the drywall installed and painted, the electricians back in to wire up the outlets and track lighting and the plumber to do the sinks. Simple..